|
Cooling Tower Helicopter Lift - 04/27/2008
On April 27, 2008 we replaced the cooling tower which sits atop the 39th floor. A helicopter (with a very good pilot) made 4 lifts - from start to finish, the project took about 35 minutes. The pictures below were taken during the installation and were contributed by various residents. If you have any pictures that you would like to contribute, please email them to Web@TheElmAtClark.Com
There is an interval of about 8 seconds between pictures. Use the buttons if they move to slow or to fast.
|